EPACK Group
  • Home
  • Group Overview
  • Group Services
  • Media
    • Epack Group Media Highlight
    • Media Coverage
    • Events Gallery
  • Contact us
Call Anytime +91-8130444466
Epack Group

EPACK Prefab Takes on the Challenge of Constructing India’s Fastest-Built Factory Building in 150 Hours

Passionate In Marketing

By admin

Share post:
  • Prev Post
  • Next Post

Latest Post

  • The Economic Times
    What EPack Durable’s MD has to say on Q3 turnaround, debt and stock’s tepid show
  • The Hindu Business Line
    Epack Durables falls 10% on listing day
  • Outlook Business
    Pre-Engineered Buildings Lay Foundation Of Sustainability In Construction
  • Mint Live
    Q3 Results Today: Ballarpur Ind, Hardwyn India, R Systems and more to post earnings as earning season nears end
  • Tv9 Bharatvarsh
    लोहे के गार्डर से खड़ा हो गया दरभंगा एयरपोर्ट, ऐसे देश भर में फैल रहा प्रीफैब्रिकेशन कंस्ट्रक्शन का कारोबार
  • Ad Gully
    EPACK Group strengthens leadership with appointment of Narayan Lodha as Executive Director and Group CFO
  • Et Auto
    Auto Giants bullish on pre-engineered buildings
  • B2b Purchase
    EPACK Prefab’s innovative Pre Engineered Buildings demonstrate structural integrity and operational efficiency
  • Bwdisrupt
    Need For Embracing Prefabricated Construction To Achieve Net Zero
  • Devdis Course
    EPACK Durable raises USD 40 mn in funding round led by Affirma Capital

Copyright © 2026 EPACK Group. All Rights Reserved.