
EPACK Prefab Completes 10 Million ft2 Warehouse Construction

Latest Post
- शेयर बाजार में लिस्टेड Epack Durable नए सेगमेंट में उतरने जा रही है, जानिए क्या है कंपनी का प्लान?
- Budget 2024 Expectations: What construction sector wants from FM Nirmala Sitharaman in Union Budget 2024-25
- Why Pre-Engineered Buildings (PEB) are Preferred Over Conventional Construction Methods: Insights from EPACK Prefab Company
- EPACK Prefab to construct India’s fastest-built factory building in 150 hours
- EPACK Durable Donates 560 Bicycles To AIIMS Delhi
- World Water Day 2024: Alternative methods to conserve water
- EPACK Group appoints Narayan Lodha as CFO
- EPACK, original design manufacturer of ACs, to set up ₹200-crore unit in Sri City of Andhra Pradesh
- EPACK Durable Integrates Sustainability with Easy Commuting Donates 560 Bicycle AIIMS doctors, Nurses and Paramedics!
- Pre-Engineered Buildings: The Need of the Hour